Find the results that matter
Lorient Agglomération is installing a solar farm covering 7 hectares in Inzinzac-Lochrist. Equipped with 8,500 photovoltaic panels, it will offer a maximum power of 5 MWp and an estimated annual production of 6 GWh, equivalent to the electricity consumption of 2,000 households.
The municipality of Prunelli Di Fiumorbo is investing €19 million in the construction of a new school complex to improve conditions for children. This project involves the creation of 24 classrooms, accommodating between 600 and 650 pupils, and will bring the primary and nursery schools together on the same site.
The SDIS 34 is investing €35 million in the construction of a centre for emergency preparedness, intended for the training of firefighters. Designed to accommodate 200 trainees per day, it responds to the growing challenges related to natural, technological and societal risks.
The Abidjan metro is a key project for the sustainable growth of the Ivorian capital. This project, jointly carried out by Alstom, Bouygues Travaux Publics, Colas Rail and Keolis, was awarded the “Deal of the Year Africa” prize at the TXF Global export forum in June 2023.
The 353-km-long La Côtière road connects Abidjan to San Pedro, the world's main cocoa port. Its renovation, completed in 2023, will reduce travel times, improve road safety and facilitate access to the areas it passes through.
The Dogger Bank project comprises three offshore wind farms of 1.2 GW each, located in the North Sea, 130 km from the British coast. With a total capacity of 3.6 GW, it will become the largest wind farm in the world.
Benin is deploying, with among others things, the support of an export credit, essential infrastructure – transport networks, substations, distribution and connection kits – to improve access to electricity and increase the connection rate, i.e. the proportion of the population effectively connected to the electricity grid, to 75% by 2025 (compared to 45% in 2019).